Greensted Junior School

Posted by

Project Details

Type                   Flat Roofing

Duration           12 weeks

Manufacturer   Langley

Scope

The provision of scaffold access and roof edge protection together with the installation of debris chutes and mechanical material hoists. The removal of the existing flat roof coverings and the installation of replacement roof coverings comprising of a primer, vapour control layer, 120mm insulation, underlayer and cap sheet. The replacement of the existing rooflights with new and the installation of new high-level windows to take account of the increased insulation depth across the adjoining flat roof areas.