1 – 12 Bennett Court

Posted by

Project Details

Type                           Flat Roofing

Duration                   5 Weeks

Manufacturer         Langley

Scope:

The provision of temporary scaffold access and roof edge protection. The installation of new Langley roof coverings comprising vapour control layer, insulation, underlay and cap sheet. The removal of loose coping stones and capping the exposed parapet wall with ply ready to receive the new roof coverings. Repointing works and other remedial works to the roof-based tank room including the installation of a new door frame and new double doors. The installation of a permanent free-standing edge protection handrail system together with a lightning protection system. The provision of new lead collars and flashings, new rainwater outlets, edge trim and cable trays.