Maudsley Outpatients Department

Posted by

Project Details

Type                            Flat Roofing

Duration                   8 weeks

Manufacturer         Bauder

Scope:

In addition to the replacement of the flat roof coverings to the rear of this Grade II listed building, Acclaim Contracts installed a new rooflight over the large existing glass-block roof dome. Two courses of tiles had to be removed from the entire perimeter of the pitched roof to allow a new lay board to be installed. The replacement felt gutter detail was dressed onto the new lay board and the tiles replaced. A significant amount of detailing had to be completed around the roof-based plant and equipment while other redundant equipment was removed altogether. The outpatients department remained fully operational throughout the works including the main reception area directly below the large roof dome. We completed on time and to budget and are looking forward to working again with SLaM NHS Foundation Trust.